Production scheduling
Machine down, materials late, labor constrained.
For manufacturing operations
A machine goes down, materials arrive late, or labor is short. Faraday lets a manufacturer test schedule recovery before throughput, delivery, or margin takes the hit.
Connect ERP, MES, CMMS, SOPs, schedules, and operator decisions. Train a schedule agent against realistic plant conditions, then run approved decisions through Faraday's runtime with safety, quality, service, and margin gates.
Talk to usYour systems · your rules · your people
Bring together the information people already use.
Use the workflow builder to shape a bespoke agent around the work.
Try the decision against realistic disruptions.
Keep people in control of high-stakes actions.
Learn from results and strengthen the workflow over time.
Example workflows
Each workflow is measured against the operating and financial outcome your team already manages.
Machine down, materials late, labor constrained.
Prioritize work around critical assets and people.
Route holds and rework without starving demand.
Recover shortages and substitutions before a line stops.
The operating standard
Prove the decision in a private environment. Deploy it with human gates, monitoring, audit trails, and rollback. Improve it as the operation changes.
Start with one workflow